June 27: Study

Study completed. Mostly.

Study

Study

June 23: Living room takes shape

The shelves are in place!

Livng Room Shelf

Living room shelf, still under construction

Living Room Shelf 2

Another view of the shelf

Display cabinet in Living room

Display cabinet in Living room

June 19: National Day rehearsal floodlights visible

Floodlights in the sky on the right

June 19: Light installation in progress

And now…I can check on the progress at night!

Living room Lights

Living room lights

Fan

Fan

Spinning fan

Spinning fan

Entryway

Entryway in brightness for the first time

Corridor lights

Corridor lights

Bedroom 2

Bedroom 2

Master bedroom

Master bedroom

Master toilet light

Master toilet light

June 17: Kitchen appliances delivered

Kitchen appliances arrived June 16 & 17. They were supposed to be all delivered on the 16th, but the Orchard Road Flood turned all delivery plans into chaos.

Refrigerator

Refrigerator

Hood

Hood

Hob

Hob

Another Hob

Another Hob

Oven

Oven

Washing Machine

Washing Machine

Free soap with the washing machine!

Free soap with the washing machine!

June 13: Shower screens

Shower screens have been installed. Pretty solid!

Guest toilet

Guest toilet

Master bedroom toilet

Master bedroom toilet

June 11: False ceiling added; toilet items & kitchen sink delivered!

False ceiling for the entire flat. Down lights to be added later.

False ceiling in Living Room

False ceiling in Living Room

Living Room

Living Room again

Corridor with false ceiling

Corridor with false ceiling

Toilet items and kitchen sink

Toilet items and kitchen sink